Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Status of J-PARC accelerators

Hasegawa, Kazuo; Kinsho, Michikazu; Oguri, Hidetomo; Yamamoto, Kazami; Hayashi, Naoki; Yamazaki, Yoshio; Naito, Fujio*; Yoshii, Masahito*; Toyama, Takeshi*; Yamamoto, Noboru*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1235 - 1239, 2019/07

After the summer shutdown in 2018, the J-PARC restarted user operation in late October. While beam power to the Materials and Life Science Experimental Facility (MLF) was 500 kW as before the summer shutdown, linac beam current was increased from 40 to 50 mA. Operation of the Main Ring (MR) was suspended due to the modification and/or maintenance of the Superkamiokande (neutrino detector) and Hadron experimental facility. The user operation was resumed in the middle of February for the Hadron experimental facility at 51 kW. But on March 18, one of the bending magnets in the beam transport line to the MR had a failure. It was temporary recovered and restored beam operation on April 5, but the failure occurred again on April 24 and the beam operation of the MR was suspended. In the fiscal year of 2018, the availabilities for the MLF, neutrino and hadron facilities are 94%, 86%, and 74%, respectively.

Journal Articles

1 MW and long pulse operation of Gaussian beam output gyrotron with CVD diamond window for fusion devices

Kasugai, Atsushi; Sakamoto, Keishi; Takahashi, Koji; Kajiwara, Ken; Shoyama, Hiroaki; Ikeda, Yukiharu; Tsuneoka, Masaki; Ikeda, Yoshitaka; Fujii, Tsuneyuki; Kariya, Tsuyoshi*; et al.

Fusion Engineering and Design, 53(1-4), p.399 - 406, 2001/01

 Times Cited Count:17 Percentile:74.75(Nuclear Science & Technology)

no abstracts in English

Journal Articles

A preliminary study of the proton storage ring for the neutron science project at JAERI

Kinsho, Michikazu; Noda, Fumiaki*; Kusano, Joichi; Mizumoto, Motoharu

Proc. of 11th Symp. on Accelerator Sci. and Technol., p.341 - 343, 1997/00

no abstracts in English

JAEA Reports

Design of a CW high beam powerelectron linac

Wang, Y.

PNC TN9410 92-039, 26 Pages, 1992/02

PNC-TN9410-92-039.pdf:0.63MB

A test CW electron linac is designed to develop a high power accelerator to treat waste radioactive material. The linac is to be operated at the room temperature and is energized by two 1.2MW CW L-band klystrons to produce an electron beam with the energy of 10MeV and current of 100mA. The average beam power is 200KW-1MW for the duty factor 20%-100%. In designing such high power electron linear accelerator, an accelerating section having a traveling wave resonant ring is adopted. By adopting such type of acceleration section, it became possible to choose very short length of the accelerator sections to elevate the threshold current of beam break-up (BBU) keeping the high accelerator efficiency. In designing the linac with the traveling wave resonant ring, some special considerations and calculations are introduced. The variational method is used to calculate the sizes and parameters of the disk-loaded accelerator structure. There is the discrepancy of the order of a few hundredth of one percent between the calculated frequency and the experimental one. A kind of internal cooling water structure is adopted to disperse the generated heat by RF efficiently. Currently, its components development is in progress at OEC.

4 (Records 1-4 displayed on this page)
  • 1